Large-Scale Cleaning Project Completed in Three Phases
Post-construction cleaning is one of the final and most important steps before a new building is ready for its grand opening, inspections, and occupancy. Even the best construction work can be overshadowed if the finishing clean isn’t done properly. Dust, debris, residue, and fingerprints can quickly take away from an otherwise beautiful result.
At Miss Green Clean, we provide premium, eco-friendly cleaning services that help builders, contractors, and project teams deliver spaces that are spotless, polished, and ready for turnover.
One of our most recent large-scale projects was a four-storey women’s crisis centre in Cold Lake, Alberta, approximately 10,000 square feet per floor, completed as a three-phase post-construction clean.
With the scale of the building, the variety of rooms, and construction still active throughout the process, this project required a strategic plan, consistent teamwork, and strong attention to detail.
Project Overview: A Complex Multi-Use Facility
This building wasn’t a simple open-concept layout. It was a multi-purpose crisis centre designed to support residents with safe, comfortable spaces that feel like home.
The facility included:
- Apartment-style units with full kitchens and bedrooms
- Balconies throughout the building
- Multiple bathrooms across each floor
- A daycare and school area
- A hair salon
- A large commercial kitchen
- Offices, stairwells, and shared common areas
Between private living spaces and high-traffic public areas, the project required a detailed and consistent cleaning approach to ensure everything, from floors and fixtures to surfaces and corners, met a high standard.
This is exactly the type of large-scale project that requires an experienced post-construction cleaning team, especially when deadlines are tight and final presentation matters.
The Challenge: Active Construction and Constant Changes
One of the biggest challenges of this Cold Lake project was that construction remained active every day. Our team worked alongside approximately 20 to 40 subcontractors daily, which meant the environment was constantly changing. Different trades moved through different floors, new areas were completed, and priorities shifted depending on site timelines.
To stay organized and maintain momentum, our cleaning team held daily meetings with the site superintendent. These meetings helped confirm which areas were ready for cleaning, identify priority spaces, and ensure our work aligned with the construction schedule.
Like most large builds, plans often changed quickly. Areas scheduled for cleaning would suddenly become active again, while other spaces needed urgent attention with little notice. This is where our team truly excelled by providing flexibility, strong communication, and experience.
At Miss Green Clean, we pride ourselves on being a premium cleaning service that can adapt quickly without sacrificing quality.
Our Project Approach
Due to the size of the facility and the many moving parts on-site, this project was completed using a three-phase post-construction cleaning process. This approach supports progress throughout the build and ensures consistent results from floor to floor.
Phase 1: Rough Cleaning
During the early stage, our team focused on removing construction debris, dust buildup, and leftover materials as trades moved through the building. This phase helped keep the worksite safer and easier to manage.
Phase 2: Mid Cleaning
As more rooms and units were completed, we moved into detailed cleaning in finished areas while continuing to work around active trades. With multiple types of spaces, including bedrooms, bathrooms, kitchens, offices, daycare zones, and common areas, attention to detail was essential to maintain consistent cleanliness throughout the facility.
Phase 3: Final Cleaning (Inspection Ready)
The final phase was a detailed finishing clean designed to support inspections, walkthroughs, and turnover. This stage is critical, as even small missed details can stand out during final reviews.
This structured approach is one of the reasons builders and contractors trust Miss Green Clean as a reliable commercial cleaning company serving Canmore, Calgary, and Cold Lake, especially on complex builds that require precision.
What Made This Project a Success
This was not just a large square footage project. It was a high-detail environment that required strong coordination and consistency.
Key factors that contributed to a successful outcome included:
- Daily communication with the site superintendent
- Flexibility as priorities shifted
- Strong organization across multiple floors
- A trained team delivering detailed results under pressure
- Consistent cleaning standards across living units and shared spaces
Even with construction active throughout the project, we remained focused on delivering a clean that matched the quality of the build itself.
The Result: Smooth Turnover and a 5-Star Review
Despite the scale and complexity of the Cold Lake facility, the project was completed successfully. Turnover went smoothly, and both the client and contractors were very pleased with the final result.
We also received a 5-star review highlighting our professionalism, attention to detail, and ability to deliver under pressure. These are exactly the qualities builders and project managers look for in a trusted post-construction cleaning partner.
If you’re looking for experienced commercial or residential cleaners serving Canmore, Calgary, and Cold Lake, Miss Green Clean delivers premium, eco-friendly services for builders, property managers, and high-end clients. With over 15 years of experience, our team provides inspection-ready results using sustainable, non-toxic products.